It has been said that creating silk plaster liquid wallpaper at home is a straightforward DIY job. I guess you're correct. When you're prepared to begin your home makeover, though, here are some tips on what to do and how to do it.
We must first examine the area that you want to use liquid wallpaper to cover. Silk plaster may be applied to almost any surface, making it very versatile. However, before you can accomplish that, you must identify the surface and prepare it for further work.
Step 1: Get the surface of the wall ready.
Today, drywall is routinely used to construct interior walls. Gypsum paste is used to align the seams and screws are utilized to hold the sheets in place. This allows for the quick and economical creation of any interior solutions.
You must first cover the entire surface with an impregnation or solution of the special Silk Plaster primer. Add two applications of the original Silk Plaster primer after that. To decide how the primer will be applied to the walls, apply it beforehand to a few small test areas. For the greatest results while using liquid wallpaper, we advise adding gypsum mixtures to the walls.
Before applying liquid wallpaper, any surface must be cleaned of all oil and balanced, especially if it has metal components. Any protruding or flat metal parts, such as light fixtures, electrical panels, reinforcing bars, or ducts, must also be primed with Silk Plaster. Additionally, remember that electrical nodes need ongoing access; as a result, we don't recommend plastering or painting over them.
Partially painted walls are common since partial dyeing in brilliant colors is one of the most popular home design solutions. By employing a variety of colors, you can make the space appear larger. It's vital to prevent the emergence of a smooth color transition (the so-called "waterline") once the liquid wallpaper has dried.
We suggest priming the surface with two coats of Silk Plaster before painting it white. To achieve the greatest results when applying liquid wallpaper, we propose that you prepare the walls using gypsum combinations.Locally, mezzanines, arches, and entrances are made from materials such plywood, fiberboard, and MDF, among other interior solutions. Liquid wallpaper can be used to properly seal and keep moisture out of wooden surfaces. Additionally, it's critical to remember that a sheet's propensity to distort rises with thickness.
We propose priming such surfaces using a specialist Silk Plaster primer in 2-3 layers while applying it longitudinally and transversally before applying liquid wallpaper to them.
It could be difficult to work with plastered brick or plain concrete walls. Water-based paints have a tough time sticking to such surfaces because of their great absorbency. The surface won't be as white as you need it to be even after 20 applications of paint.
In this case, smoothing the surface and applying gypsum mixtures to the wall to fill the pores with the material would be the best course of action. After that, apply two coats of Silk Plaster primer. This will stop paint from seeping into concrete. If the concrete wall is initially fragile, violently rips off, or collapses, the employment of any materials is difficult since adhesion is basically nonexistent. For the greatest results, we suggest plastering the walls with certain compounds before applying liquid wallpaper. Use any manufacturer's industry-recognized strengthening primer.
The last structural material is Oriented Strand Board (OSB), which consists primarily of pressed and glued wood fiber. The surface needs to be carefully cleaned and prepped before applying liquid wallpaper. We strongly advise either buying a pre-made version with the walls already sheathed in drywall or doing the sheathing yourself.due to its strong resistance to moisture.
Low density OSB is used for inside house partitions, and high density OSB is used for exterior decoration. Such a dish could be utilized as outdoor decor. Because they are more versatile, we suggest using moisture-resistant boards for external and interior décor when designing dividers. Prior to being plastered with gypsum mixes, such plates need to be painted with water-based paint or primed.Step 2: Primer
Apply a deep penetration primer to the surface once it is prepared—dry, smooth, clean, monochromatic white, free of stains and dust. Apply two applications of Silk plaster primer to the surface to completely cover it. Each layer of treatment has a 24-hour drying time in between.
Take note that the second layer of Silk plaster priming should be applied 24 hours after the ornamental Silk plaster plasters.
Step 3: Making the material ready
Fill a plastic bottle with clean, impurity-free water that is room temperature (20 to 25 degrees Celsius). The water requirements for each type of ornamental plaster are indicated on the container.
Then pour the contents of the packet into the water. Add glitter and/or other decorative elements to the surface as desired.
Please be aware that you must purchase each type of glitter and additive separately.
Make sure the mixture is adequately blended by hand to avoid glue clumps. You should use a drill with a mixer nozzle to mix some substances, according the label on the bottle.
Reminder: Combining portions of the same product is prohibited.
If necessary, combine several packages of Silk plaster at once.
One wall (surface) should be entirely covered with material from the same mix.
The drug needs to be maintained for 12 hours in a plastic bag.
Step 4: Application
Before using, make sure the substance has been thoroughly mixed by hand. Certain compounds require the use of a drill with a mixing nozzle. Using a plastic trowel, evenly distribute small amounts of the mixed substance from the kneading process all over the surface.
After a couple of hours, trowel the surface while wetting it. The material must be used within 48 hours of soaking. The humidity shouldn't be more than 70%, and the air shouldn't be any cooler than 15 degrees Celsius.
Enhance the surface's lifespan and the chance of future wet washing by using Silk plaster varnish.
Submit your details below and we will get in touch with you within 1-2 working days!